|
Recent Animal Sheltering
Projects: Only major projects are listed. Frequent consulting and
owner/architect training not included but references are available
on request.
| JOHN ANCRUM SPCA , Charleston, SC |
2006 |

Consulting Design Architect to Glick/Boehm & Associates, Charleston SC
Principal in Charge: Myles Glick AIA
Site analysis, programming and schematic design for the local architect-of-record Glick/Boehm. Continuing consulting with specialized animal holding details and materials. Currently under construction with February 2008 completion. Anticipated cost of construction +/- $8,000,000
| WHATCOM
HUMANE SOCIETY, Bellingham, WA |
2005 |

Penny Cistaro - Executive Director
Site analysis, programming,
and complete architectural services for a new 28,000sf facility.
LLC with local architect for project development and delivery of
all construction services. Schematic Design completed 2005.
Anticipated cost: +/- $5,000,000
| HUMANE
SOCIETY of CATAWBA COUNTY, Hickory, NC |
2003 |

Jane Earnest –
Executive Director
Planning, programming
evaluation, site selection and complete architectural
services. Completed December 2007. Cost of construction $2,500,000.


HUMANE
SOCIETY OF WASHINGTON COUNTY
Hagerstown, MD |
1997 |

Paul Miller - Executive Director
Complete architectural
services for a new animal control and sheltering facility. Site
analysis and zoning variances required and granted. Programming, complete design
services, construction documentation, bidding, and construction
administration. Construction completed on time and on budget November 2001.
$1,450,000
|
KENNEBEC VALLEY HUMANE SOCIETY, Augusta, ME |
1997 |
Debora Clark - Executive
Director
Follow-up analysis from
an HSUS Team Study. Complete architectural services for the additions
and renovations to the existing facility. Competitively bid and
construction contract awarded July 1998. Completed 1999. $900,000
|
VANDERBURGH HUMANE SOCIETY, Evansville, IN |
1996 |

Kendall Paul - Executive
Director
Site selection, programming,
and complete architectural services. Construction documents prepared
for competitive bidding. Project bid on budget 2/02. General construction
completed 2004. Project budget: $3,000,000
|
FUND FOR ANIMALS, INC. , New York, NY |
1995 |

Cleveland Amory / President-Chairman
Lia Albo / Project Manager
Site selection, programming,
design, preparation of construction documents, competitive bidding,
and construction administration for one of the earliest prototypes.
Completed 1995 $475,000
|
PENINSULA HUMANE SOCIETY, San Mateo, CA |
1993 |
Executive Director: Kathleen
Savesky
Director of Operations: Penny Cistaro
Renovations of existing
inadequate spay/neuter clinic. Guiding the Owner by preparing RFPs
for "design/build" proposals using preliminary design
drawings and supporting information from local general contractors.
|
AMERICAN SOCIETY FOR THE PREVENTION OF CRUELTY TO ANIMALS
(ASPCA) |
|
Contact: Julie Morris
/ Senior VP - National Shelter Outreach
Medical Advisor: Lila
Miller DVM
(a) "As-built"
review of the new corporate office and separate shelter buildings.
Concentration on possible solutions to inappropriate materials,
details, and systems. Follow-up, at sheltering building, with detailed
"team" study of inadequate heating, ventilating, air-conditioning,
and animal kenneling facilities. Management of corrective work with
detailed construction drawings, manufacturer liaison, and on-site
follow-up.
1992
(b) Construction documents
and project management for the reconstruction of the Manhattan Shelter
prior to the transfer of Animal Control to the City of New Yorkl;
total reconstruction of the HVAC system, animal kennel/cages; and
systems renovations. 1994
|
MASSACHUSETTS SOCIETY FOR THE PREVENTION
OF CRUELTY TO ANIMALS (MSPCA) |
1993 |
President: Dr. Gus Thornton
VP Humane Services: Carter Luke
Extensive site selection
study for replacement shelter for Brockton, Massachusetts. All governmental
reviews, processing zoning variances and coordination of legal,
survey, and engineering consultants resulting in the finding of
two acres of previously un-platted land accessing a prior land-locked
site bordering a 100 acre conservation trust. Programming, design,
and construction documents for the new 10,000sf shelter. $1,000,000
Completed 1993
|